The KAMP Process

Five phases,
from first idea to handover.

A simple structure — not a simplified version of the work, just a clear one.

"You only commit to the stage you are entering."
01

Discover

Understanding the project — your budget, your programme, and the land itself.

02

Design

Turning ideas into a project that can actually be built — with the practical and technical constraints of the site and the climate accounted for from the start.

03

Define

Final plans, specifications, contractor quotations, and a final budget — reviewed and consolidated before construction begins.

04

Build

Construction management: site meetings, documentation, and quality control throughout.

05

Deliver

Punch list, corrections, final inspection, handover and warranties.

A client is never committed beyond the phase they're currently in. It's possible to stop, or change direction, before moving into the next one.

During Build

Site meetings, every ten days.

KAMP also makes unscheduled or additional visits whenever needed — the ten-day rhythm is the baseline, not the limit. Each meeting typically covers:

A walk through the site
Photographs
Progress against the programme
Technical questions
Client decisions
Technical decisions
Points requiring a decision
A round-table discussion, then a report

KAMP is the link between the contractors and the client. When a client decision is needed, KAMP follows up on it and passes the outcome on to whoever needs it on site.

05 — Deliver, in detail

Delivery: punch list to handover.

Once the contractor considers the house ready, delivery follows a structured sequence rather than a single handover date.

Punch list

KAMP and the client walk the site together with the contractor. Every defect found is identified, photographed, and described. The contractor generally has around fifteen days under the contract to complete corrections.

Final inspection

A further visit confirms which items have been resolved. A formal document recording the closure of the punch list is produced at this stage.

What this triggers: once the punch list is closed, the client is invited to pay the final instalment (Parfait Achèvement), and this is also the point from which the legal warranty periods begin to run.